Subway Batong Line (Subway Line 1 Extension)
Departure: Sihui
Terminal: Tuqiao
Length: 18.96 km (11.78 miles)
Number of Stops: 13
One-way runtime: 30.5 minutes
Map color: red
Other Information: The Subway Batong Line was opened on December 28, 2003, and has been played an important role in the transportation of east areas of Beijing. It connects with the Subway Line 1 in the west at the stations of Sihui and Sihuidong; therefore, it is regarded as the Line 1 Extension (Line 1 Ext.).
Timetable
|
Stations
|
Sihui to Tuqiao
|
Tuqiao to Sihui
|
||
|
First Train
|
Last Train
|
First Train
|
Last Train
|
|
|
Sihui (四惠)
|
06:00
|
22:45
|
-
|
-
|
|
Sihuidong (四惠东)
|
06:03
|
22:48
|
05:49
|
22:34
|
|
Gaobeidian (高碑店)
|
06:05
|
22:50
|
05:47
|
22:32
|
|
Chuanmei Daxue (传媒大学)
|
06:08
|
22:53
|
05:44
|
22:29
|
|
Shuangqiao (双桥)
|
06:11
|
22:56
|
05:41
|
22:26
|
|
Guanzhuang (管庄)
|
06:14
|
22:59
|
05:38
|
22:23
|
|
Baliqiao (八里桥)
|
06:17
|
23:02
|
05:35
|
22:20
|
|
Tongzhou Beiyuan (通州北苑)
|
06:20
|
23:05
|
05:32
|
22:17
|
|
Guoyuan (果园)
|
06:23
|
23:08
|
05:29
|
22:14
|
|
Jiukeshu (九棵树)
|
06:25
|
23:10
|
05:27
|
22:12
|
|
Liyuan (梨园)
|
06:28
|
23:13
|
05:24
|
22:09
|
|
Linheli (临河里)
|
06:30
|
23:15
|
05:22
|
22:07
|
|
Tuqiao (土桥)
|
-
|
-
|
05:20
|
22:05
|
Tickets
Flat Fee: CNY 2
Transfer Station
|
Stations
|
Subway Line
|
Bus Number
|
|
Sihui
|
Line 1
|
496, 608, 628
|
|
Sihuidong
|
Line 1
|
628, 976 Zhi (976支)
|
|
Gaobeidian
|
-
|
976 Zhi (976支)
|
|
Chuanmei Daxue
|
-
|
976 Zhi (976支)
|
|
Shuangqiao
|
-
|
976 Zhi (976支), Yuntong 111 (运通111)
|
|
Guanzhuang
|
-
|
639, 731, 846, 855
|
|
Baliqiao
|
-
|
846, 855, 976 Zhi (976支)
|
|
Tongzhou Beiyuan
|
-
|
855, 924, 976 Zhi (976支)
|
|
Guoyuan
|
-
|
938, 938 Zhi (938支), 938 Zhuan (938专), 976 Zhi (976支), 991
|
|
Jiukeshu
|
-
|
938, 976 Zhi (976支)
|
|
Liyuan
|
-
|
976 Zhi (976支)
|
|
Linheli
|
-
|
924
|
|
Tuqiao
|
-
|
924
|
Toilet
Each station of this subway line has a toilet in the ticket hall.
Comments and Questions